Thursday, June 18, 2009
ROAD CONDITIONS AT KALWA - VITAVA SUBWAY
This photo was clicked by me on 14th June, 2009 @ 7.50 a.m. of a horrible road @ Kalwa - Vitava Subway.
Traffic jam at this junction is a regular feature.
Basic reason for this traffic jam is water which is leaking from a under ground water pipe . This water damages the top surface of the road at this location.
This situation is there 365 days a year. This is the biggest culprit to spoil the road in the subway.
In the photo you can easily see pot holes inspite of no rain . If now this is the condition of the road, then what will happen in the Monsoon ?
On Saturday, March 28, 2009 I had mailed to The Commissioner - TMC as this is to be undertaken by TMC.
In between some temperary patch works was done, but you can see the present condition of the road.
It is quite shocking that all MPs, MLAs, travel from this road, no body is serious to solve this problem once for all. Can't local corporators see this situation ?
Where common man should go for a solution for this problem ?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment